Complly Risk — £39 a month on special offer. See the plan →
See it

Watch Complly work

About a minute per product, no sound needed. No sign-in, no call. Then try it yourself on sample data.

Real screens from the product, on made-up companies. Nobody’s real data is shown.

Complly Risk · Example Roofing Ltd, a made-up company
Rodney sets the company up: A guided setup with Rodney: who you are, what you do, and the documents you should hold. About ten minutes, and you can stop and come back.Your website does the typing: Drop in your website and Rodney reads it to pre-fill the next steps. You check and correct everything before it counts.Describe the job in plain English: A re-roof on Northgate Road: three people, about eight days, scaffold front and back.Rodney asks only what he must: Two questions about the job: how you get onto the roof, and whether there is hot work.Check it, then create it: Rodney sets out what he will write, with the title, client and site already filled in.The RAMS is written: It lands on the dashboard with what to do next: send it for signing.Every hazard, scored before and after: The risk assessment scores every hazard before and after its controls, on the HSE 5×5 matrix.Signed off, then on the crew’s phones: A competent person signs it off from a secure link, and the crew sign it on their phones.

Rodney sets the company up with you, a few questions at a time.

1 / 8
Complly Risk · for subcontractors

A RAMS from a plain-English job description

Set the company up once. Then describe each job the way you would tell a colleague: Rodney asks only what he cannot work out, writes the RAMS, and it goes for sign-off and onto the crew’s phones.

  1. 1Set up in minutes
  2. 2Describe the job
  3. 3The RAMS
  4. 4Sign off and send
Complly Construct · Example Groundworks Ltd, a made-up company
Your website does the typing: Rodney sets the company up with you, and reads your website to pre-fill the answers. You check and correct them.Ask Complly to write it: Your company RAMS is what every site RAMS copies from. Our health and safety team writes it from your setup answers.Nick asks what only you know: Nick, from our health and safety team, asks a couple of questions so it describes your work and nobody else’s.Read it, accept it: It arrives reviewed and signed by Nick. Read it and accept it, and every site RAMS copies from it.Where each site stands: Riverside Depot: 61% through the CDM 2015 stages, and the one thing needed next. Confirm the asbestos survey.Ask Rodney about the site: Ask Rodney what a stage means, what is blocking the site, or what to do next.How the figure is made: If this site were prosecuted today: the Sentencing Council starting point for the worst open gap, with every number shown.Every site, side by side: Exposure across the company: which site drives the figure, and what each gap is worth.Try a scenario: Tick the fixes you could make and watch the figure fall, before you spend anything.

Rodney reads your website and pre-fills the setup. You check it.

1 / 9
Complly Construct · for principal contractors

Every site, and what it could cost you

Your company RAMS written by our health and safety team. Every site followed through the CDM 2015 stages, and the biggest gap priced, so you can see the liability you are carrying, site by site.

  1. 1Set up
  2. 2Your company RAMS, written for you
  3. 3Every site
  4. 4What it could cost

Illustrative, not legal advice. Liability here means exposure to fines under health and safety law, not insurance. Missing information raises the figure; it never hides it.

Also on the way

Two more products are being built. We will show them working here once they are ready, and not before.

Seen enough? Try it yourself.

The live demo opens the real product on a made-up company, in your browser. Describe a job and watch Rodney write the RAMS, or open a site and see what it could cost.