Complly is in Early Access — free credits for early users while we finalise pricing. Join Early Access →
Our apps

Two apps, one Rodney

Complly Construct is for the main contractor who has to prove the whole job was managed properly. Complly Risk is for the subcontractor who needs the RAMS tonight. Both read from the same hazard register, and both keep Rodney's draft-then-sign-off rule: nothing goes out until a competent person has approved it.

The CDM 2015 journey

The whole project, on one thread

One project record feeds every phase — so the documents stay consistent, the golden thread holds, and nothing falls through the gaps between stages.

Rodney threads it together
The source of truth Project record & hazard register Every document below reads from this — change a hazard once and it flows through.
Pre-construction
  • Hazard register (source of truth)
  • Pre-construction information
  • Asbestos & structural surveys
  • Design risk information
Planning
  • Construction phase plan
  • F10 notification pack
  • Permits register
  • Competent-person sign-off
Construction
  • RAMS & COSHH assessments
  • Toolbox talks & inductions
  • Permits to work
  • Per-site liability tracked
Handover
  • Health & safety file
  • Residual-hazard warnings
  • Golden-thread traceability
  • Completion & sign-off

One thread, every phase — because each document derives from the same record, they can't disagree, and any hazard is traceable from disclosure to residual warning.

For the main contractor

Prove the whole job was managed properly

Principal Contractors, Principal Designers and construction companies running compliance across every site they hold.

Complly Portal

Live Free for a limited time

Run every site's compliance end to end, and see the liability you're carrying, per site, in pounds — so you close the gaps that matter before they cost you, and answer the client, insurer or HSE with one link instead of three weeks of digging through folders.

Per-site liability CDM 2015 end-to-end Team oversight Golden-thread traceability

Know your liability, site by site

  • Per-site liability — each site's worst gap priced from the Sentencing Council guideline
  • "Close it → falls to £Y" — see exactly what closing a gap is worth
  • Gap analysis matched to real HSE convictions (updated weekly)
  • Competence-gap warnings — hazards with nobody qualified, flagged not invented

The full CDM 2015 lifecycle

  • Hazard register → pre-construction information → construction phase plan → permits → health & safety file
  • Sign-off gates at every stage
  • Golden-thread traceability — nothing drifts between stages

Projects, filed automatically

  • One place per site — upload a document and it files itself
  • Import from OneDrive/Dropbox; export to Word & PDF
  • Rodney briefs you across the whole portfolio and suggests the next action
  • No-login worker voice capture from site

Oversight & control

  • Seats, roles and a shared credit pool
  • ROI & management reports
  • Full audit history across every project

Liability = your exposure to enforcement & fines under H&S law — not public-liability insurance; illustrative, not legal advice.

The Complly Risk journey

One job, on one thread

One job description feeds every document — so the RAMS, COSHH and toolbox talk stay consistent, and nothing gets missed between drafting and sign-off.

Rodney threads it together
The source of truth Job description & hazard set Every document below reads from this — change a detail once and the RAMS, COSHH and toolbox talk all update.
Describe
  • Plain-English job description
  • Trade-specific hazard templates
  • Photo hazard-spotting
  • Voice input, hands-free on site
Draft
  • RAMS, COSHH, toolbox talks & CPPs
  • Energy-based risk scoring
  • Rodney's clarifying questions
  • Reuse a previous RAMS
Challenge
  • “Attack my RAMS” red-team review
  • Approval-likelihood score
  • Severity-ranked findings
  • One-tap fix loop
Sign off & use
  • Competent-person sign-off
  • Version history & audit trail
  • Site QR live poster
  • Branded PDF export

One thread, every document — because each document derives from the same job description, they can't disagree, and every hazard is traceable from draft to sign-off.

For the subcontractor

Get the RAMS sorted tonight

Sole traders, subcontractors and small teams who need paperwork the main contractor will actually accept.

Complly Risk

Live Early Access — free

Draft the documents you live by, get them challenged, and sign them off — on your phone, on site. Describe the job in plain English and Rodney does the drafting; a hostile review catches the gaps before anyone else does.

Draft in minutes Attack my RAMS Works offline Site QR posters

Draft in minutes

  • Describe the job in plain English — Rodney drafts trade-specific RAMS, COSHH assessments, toolbox talks & CDM 2015 construction phase plans
  • Rodney's clarifying questions close the critical gaps before you deliver
  • Reuse a RAMS for a similar job; one-click summaries

Challenged before it ships

  • "Attack my RAMS" — a hostile red-team review with an approval-likelihood score
  • Energy-based risk scoring flags the high-energy hazards to control first
  • One-tap fixes for anything the review flags

On site, hands-free

  • Photo hazard-spotting — point your phone, Rodney drafts the entry
  • Voice input — dictate on site, no typing with gloves on
  • Works fully offline and syncs the moment signal returns

Signed off, and provable

  • A competent person always signs off before a document can be used
  • Version history and a tamper-proof audit trail on every document
  • Site QR live posters — a scan always opens the latest signed-off version
  • Company-branded PDF export
Product questions

The two products, answered

Which one fits, how they work together, and what Rodney will and will not do.

What is the difference between Complly Risk and Complly Construct?

Complly Risk is for the subcontractor who needs the RAMS tonight: describe the job in plain English and Rodney drafts a compliant RAMS, COSHH assessment, toolbox talk or CDM 2015 construction phase plan, ready for sign-off. Complly Construct is for the main contractor or principal designer who has to prove the whole job was managed properly: it maps each site to the documents it requires, flags what is missing, prices the gap as liability, and runs the CDM 2015 lifecycle end to end with sign-off gates. Same platform, same assistant — one hazard register threads every document across both.

Can I use both products together?

Yes, and that is the point. A project in Complly is one construction site, and the hazard register is the single source of truth for it. Whatever is captured in one product feeds the other, so the pre-construction information, construction phase plan, RAMS, COSHH assessments, permits and health & safety file all read from the same record and cannot drift apart between stages. Credits are one shared balance across both.

What is "Attack my RAMS"?

It red-teams your draft the way a hostile reviewer would, before a principal contractor sees it. You get a verdict, an approval-likelihood score, findings ranked by severity and a one-tap fix loop to close them. It is there to catch the gaps that get a RAMS rejected — missing controls, vague sequencing, hazards without a named control — while you can still do something about them.

Does Complly work on site without a signal?

Yes. Complly Risk installs like an app on a phone, documents you have already opened work offline, and anything you write queues and sends when you reconnect. You can photograph a work area for hazard-spotting or speak instead of typing. Approved documents get a site QR poster that always opens the latest signed-off version, so nobody is working from a superseded copy.

Does Rodney replace a competent person?

No, and it is designed not to. Rodney drafts and challenges; a competent person reviews, edits and signs off, and no document can be used until they have. Rodney will not invent a control it has no basis for, and where information is missing it raises the assessed risk rather than quietly assuming the best case.

What does the Portal mean by "liability"?

It means your exposure to enforcement action and fines under health & safety law, estimated per site from the Sentencing Council sentencing guideline for health & safety offences and HSE figures, and benchmarked against real HSE construction convictions, which are updated weekly. It is deliberately not the same thing as public-liability insurance, which covers third-party claims. Treat it as an illustrative guide to help you prioritise which gap to close first — not a prediction, a quote, or legal advice.

Ready to get started?

Free while we finalise pricing. No card needed. Built for the subbie who has to get the RAMS done tonight — and for the main contractor whose name is on the job if something goes wrong.